LK Automation Limited LK Automation Limited
Brand: MITSUBISHI
Go Back >> Product Catalogues
A6BSW-P-S4 | MITSUBISHI Optical media conversion A6BSW-P-S4
MITSUBISHI A6BSW-P-S4 Manual And Instructions
A6BSW-P-S4 User's Manual

MITSUBISHI A6BSW-P-S4 Product information and technical parameters:
Brand: MITSUBISHI
Name: Optical media conversion
Model: A6BSW-P-S4
Self service (IN, OUT): SI optical cable.
Other aspects (IN, OUT): SI optical cable.
Data link anomaly Bureau bypass.
Inter agency extension.
Cable transformation.

Input and output points: 480 points.
Program capacity: 7K step.
Basic command processing speed: 4.4 ~ 5.6us.
Power supply: input DAC100 ~ 120/200 ~ 240V/ output 2A DC24V, 0.5A DC5V.
Coaxial data communication line function.
Modular: PLC is the basic components of a separate module.
Medium and large PLC used this way MITSUBISHI A6BSW-P-S4. Easy maintenance.
Relay output interface circuit of PLC
Working process: when the internal circuit output digital signal 1,
There is a current flowing through, the relay coil has a current, and then the normally open contact is closed,
Provide load current and voltage A6BSW-P-S4
When the internal circuit outputs a digital signal 0, there is no current flowing through it,
The relay coil does not have a current, and the normally open contact is broken off,
A current or voltage that is disconnected from the load MITSUBISHI A6BSW-P-S4.
It is through the output interface circuit to the internal digital circuit into a signal to make the load action or not action.
User program storage capacity: it is a measure of how much the user application can store the number of indicators.
Usually in words or K words as units MITSUBISHI A6BSW-P-S4. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General logical operation instructions each account for 1 words. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4. ROM capacity: 8K bytes (max 3K step).
A1NCPU storage box. Input points: 32 points.
Voltage: AC200 ~ 240V.
Current: 12mA.
Response time: 25ms.
32 points / a common end.
38 point terminal station.
CE certification.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program A6BSW-P-S4.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to thhe adoption of centralized sampling A6BSW-P-S4.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.


...More relevant models >>>>