LK Automation Limited LK Automation Limited
Download Sort: MITSUBISHI
Home >> Manual Download
MITSUBISHI A6BSW-P-S6 Manual A6BSW-P-S6 User's Manual
Product model: A6BSW-P-S6
Name: Optic Bypass Switch
Brand: MITSUBISHI
Sort: User's Manual
File language: English
RS-232 2 channel.
Transmission speed: 2 channel total is 115.2kbps.
Equipment layer / field bus CC-Link device layer is the PLC and other control devices and sensors and drive devices connected to the field network,
Network for the lowest layer of the whole network system.
Using CC-Link field bus connection, the number of wiring is greatly reduced,
Improve the maintainability of the system A6BSW-P-S6 Manual A6BSW-P-S6 User's Manual A6BSW-P-S6
And, not just the amount of data ON/OFF and other switches,
Can also be connected to the ID system, bar code reader, inverter, man-machine interface and other intelligent devices,
From the completion of a variety of data communication, the management of the terminal production information can be realized,
On the centralized management of the state of the machine movement,
Make maintenance work efficiency also greatly improved A6BSW-P-S6 Manual A6BSW-P-S6 User's Manual.
Q series PLC in the use of CC-Link function better,
And easier to use. 10BASE5.
PLC is introduced by the relay control technology after the development of micro processing technology,
Can be easily and reliably used for switching control.
As the analog quantity can be converted into digital quantity, the number of digital quantity is just a number of switching value,
Therefore, after the conversion of analog, PLC can also be reliable for processing control A6BSW-P-S6 Manual A6BSW-P-S6 User's Manual.
Because the continuous production process often has the analog quantity, the analog quantity control is sometimes called process control.
Analog quantity is not electricity, and PLC can only handle digital quantity, quantity of electricity.
All to realize the conversion between them to have the sensor, the analog quantity into a number of power.
If this power is not standard, but also through the transmitter,
The non-standard power into a standard electrical signal, such as 1-5V, 4-20mA, 0-10V, etc..
At the same time, there is also an analog input unit (A/D),
Transform these standard electrical signals into digital signals,
The analog output unit (D/A), in order to transform the digital quantity after PLC processing into analog quantity -- standard electric signal.
So the standard telecommunication number, the conversion between the number of operations to use a variety of computing.
This requires the resolution of the analog unit and the standard electrical signal.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of.
The structured text programming language uses the computer description method to describe the various kinds of relations between the various variables in the system,
Complete the required function or operation.
Most PLC manufacturers use structured text programming language similar to BASIC language, PASCAL language or C language and other advanced languages,
But in order to be convenient, the expression methods of the statement and the types of statements are simplified.
Structured text programming language features: the use of high-level language programming, you can complete the complex control operations,
Need to have a certain level of computer knowledge and programming skills,
Higher requirements for engineering designers. Poor visibility and operability.
Switching value, also known as logic, refers to only two values, 0 or 1, ON or OFF.
It is the most common control, it is the advantage of PLC control,
Is also the most basic application of PLC.
Switch volume control is designed to,
According to the current input combination of the switch quantity aand the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order A6BSW-P-S6 Manual A6BSW-P-S6 User's Manual.
So, sometimes also known as the order control.
And seqquential control is divided into manual, semi-automatic or automatic A6BSW-P-S6 Manual A6BSW-P-S6 User's Manual.
And the control principle is decentralized, centralized and hybrid control three.
Related products
MITSUBISHI
Optical media conversion
A6BSW-P-S5
MITSUBISHI Optical media conversion A6BSW-P-S5
Self service IN, OUT: SI optical cale
MITSUBISHI
bypass switch
A6BSW-R
MITSUBISHI bypass switch A6BSW-R
Coaxial data link anomaly station. Exten
MITSUBISHI
Optical media conversion
A6BSW-P-S3
MITSUBISHI Optical media conversion A6BSW-P-S3
Self service IN, OUT: SI optical cale
MITSUBISHI
Optical media conversion
A6BSW-P-S6
MITSUBISHI Optical media conversion A6BSW-P-S6
Self service IN, OUT: SI optical cale