Input type: DC input, positive public end / negative public end.
Input points: 2 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/4mA.
Output form: transistor output, leakage type.
Output points: 2 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC12V/DC24V/0.1A.
External connection: 2 line /2 line type.
Screw terminal table type.
Minimum size of industry.
The connection object at a glance with terminal cover plate.
Input module for public end of positive pole and negative pole.
Terminal table structure capable of connecting with 2 wire type sensor and load in the same condition.
Can be installed along the 6 direction.
Output type: transistor output, drain type.
Output points: 32 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 1 wire.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction MITSUBISHI CL1XY4-DT1B2.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program
CL1XY4-DT1B2
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation MITSUBISHI CL1XY4-DT1B2. Output type: transistor output, drain type.
Output points: 8 points.
OFF leakage current: 0.1mA.
Output protection function.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 2 wire.
Sensor connector type (E-CON type).
Using industry standard E-CON type.
Simple wiring through sensor connector.
When installing the module can choose to use the DIN guide rail or screw mounting MITSUBISHI CL1XY4-DT1B2.
3 wire sensor input. Fast connector type.
Current input.
Number of channels: 8 channels.
Occupied the number of stations: Ver.1 mode occupied 3 stations, Ver.2 mode occupied 1 stations.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on thhe on-line unification to adjust CL1XY4-DT1B2.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp by step CL1XY4-DT1B2.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.