Drive: MR-H_ACN series SSC-NET compatible AC servo.
Rated output: 0.1KW.
The servo controller can easily transfer the operation module and the field bus module through the automation interface,
At the same time using different fieldbus modules to achieve different control modes (RS485, RS232, optical fiber, InterBus, ProfiBus),
And the control mode of general inverter is single.
The servo controller is directly connected with a rotary transformer or an encoder, which forms a closed loop of speed and displacement control
Q81BD-J71GF11-T2
The general inverter can only form an open loop control system.
Servo controller of the control parameters (such as steady-state accuracy and dynamic performance) is better than the general inverter. Type: HA-FH series.
Rated output: 0.1KW.
Rated speed: 3000r/min.
Electromagnetic brake: No.
From the vector control technology of AC servo motor, it has become more and more popular.
From the point of view of the real time operating system, it is just a function module that needs to be processed in real time.
Due to the multi function of the controller, intelligent requirements, a large number of signal processing,
Establishment and operation of various mathematical models of adaptive control,
Network communications and other functional modules will be in the real-time operation of the unified scheduling and management of the system to get the correct and reliable operation.
Therefore, the next generation of servo drive controller will be a collection of various modern control technology of the crystallization,
Instead of the traditional sense of power amplifier. Transmission line unit for MELSECNET/MINI (-S3) twisted pair data link.
Loop: twisted pair I/F.
Remote station: light I/F (plastic fiber).
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
Q81BD-J71GF11-T2 Operation manual/Instructions/Model selection sample download link: