AnS, QnAS bus connection, the reader to write program 2 channel connection.
Input status and input information input from the input interface,
CPU will be stored in the working data memory or in the input image register.
And then combine the data and the program with CPU.
The result is stored in the output image register or the working data memory,
And then output to the output interface, control the external drive
Q62P
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on.
This phenomenon is called the I/O delay time effect. Optional features of memory card (A/FX compatible).
2MB extended memory.
Applicable models: A985 (-V) /975/970/A960GOT (-B) /A956WGOT. Screw, 2 piece type terminal.
Voltage / current output module.
Number of channels: 2 channels.
Number of stations: 2 stops.
Station type: remote equipment station.
High speed data transfer of up to 10Mbps;
The development of CC-LINK is not only to meet the control of high speed remote I/O,
But also to meet the high speed of the field of information control.
In order to achieve this goal, the transmission speed of CC-LINK is compared with that of the previous live network system to add 40 to 10Mbps.
Such a high speed can not affect the speed of the machine control while allowing a large number of data communication. 2 channels.
10kpps.
Count input signal: DC5/12/24V.
External input: DC5/12/24V.
Output: DC12/24V, 0.5A.
38 point terminal station.
How to determine the input / output device of MITSUBISHI plc.
According to the control requirements of the system,
All input devices and output devices required for the determination of the system,
To determine the input / output device related to the MITSUBISHI PLC,
To determine the I/O PLC points.
Detailed analysis of the process and work characteristics of the controlled object,
To understand the coordination between the controlled object machine, electricity and liquid,
The control requirements of the controlled object for MITSUBISHI PLC control system are put forward,
Determine the control program, to develop a design task book.
Q62P Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=Q62P&select=5