"Universal output function: leakage type.
Program capacity: 20K step.
Basic operations processing speed: 60ns.
Communication interface: USB/RS-232.
Control mode: stored procedure repeated operation.
Input / output points: 1024 points.
End cap.
Unable to install display module (L6DSPU-C-CM), RS-232 adapter, RS-422/485 adapter.
CPU built-in functions can be easily set through programming tools.
The built-in I/O function settings can be easily carried out through the parameters of the programming tool
HC-SFS352BG1 1/29
5 s units can be used for high precision workpiece measurement in pulse measurement mode,
Can be used with a minimum of 5 s units of the input signal of the ON/OFF time (the shortest 200 s) for high precision measurement.
For example, after measuring the ON time of the sensor input,
The "moving speed" and "length" of the workpiece can be accurately calculated ".
High precision PWM control of the highest 200kHz.
In the PWM output mode, by setting the ON time and cycle time,
The duty cycle can be changed, and the minimum cycle time is 5 s.
In addition to lighting dimming control, simple motor control and heater control,
Can also be used to require high resolution detection equipment, such as a wide range of oscillators. "Express PCI bus.
Support Japanese, English OS.
Master / local station sharing.
Support Ver.2 CC-Link version.
Province distribution network module in cabinet and device.
Link to connect the 64 stations when the fastest scanning time for 1.2ms (rate 2.5Mbps).
According to the transmission distance, the transmission rate is selected from 2.5Mbps, 625kbps and 156kbps.
CC-Link/LT from the station does not need any parameter settings.
Only need to set up the transmission speed in the master module, you can use the remote I/O.
I/O control in the first class of open field network module.
CC-Link based on reliable field bus technology,
Able to transmit large number of bits data (such as ON/OFF information) and word data (such as analog information).
Consistency of CC-Link to maintain loop transmission,
And the cycle of transmission and information (instantaneous transmission) communication separately, so as to ensure the timeliness of.
Even if the information reaches saturation, it will not affect the link scan time.
Make the mixed data environment intelligent, to achieve a new manufacturing system IE CC-Link field network module.
Using Ethernet cables and connectors available on the market to reduce costs.
High speed communication capable of communicating with 1Gbps.
Improve the communication response, significantly shorten the cycle time.
Improve the performance of cycle data update. Reduces the transmission delay time and the application of the synchronization waiting time.
Data can be read or written to other station programmable controller.
Status of IE CC-Link field network can be confirmed by Works2 GX.
Can be in the Works2 GX up and down the abnormal position, the cause of the exception, the event record,
So it can reduce the time of abnormal to resume normal operation.
HC-SFS352BG1 1/29 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=HC-SFS352BG1 1/29&select=5