Can be isolated to obtain DC24/48/100V, AC100/200V input signal.Conversion unit 200VAC/400VAC level.
MITSUBISHI motor general AC servo amplifier MELSERVO-J3 series.
Need conversion unit MR-J3-CR55K) supporting the use of.
Rated output: 55kw.
Power specification: three phase AC400V.
Pulse train and analog input as universal interface.
Can choose the position, speed and torque control mode.
The use of advanced tuning features such as advanced vibration suppression control and adaptive filter,
Greatly improve the performance of the machine
GT1555-QSBD
MR-J3, your partner.
Higher performance, more features, more convenient to use.
Highest performance in the industry.
Speed response frequency up to 2.1kHz. Cable length: 1m.
Connection between a power supply unit (A0J2-PW) and a graphic operation terminal for A0J2HCPU.
Applicable models: GT16, GT15, GT11. 5 slots.
Can be installed in the power supply unit for AnS series units installed QnAS/.
The popularization and application of PLC programming has been developed rapidly in our country,
It has been widely used in all kinds of mechanical equipment and production process of electrical control devices,
All walks of life have emerged a large number of application of PLC transformation of the results of the equipment.
Understand the working principle of PLC, have the ability to design, debug and maintain the PLC control system,
Has become the basic requirements of modern industry for electrical technicians and engineering students.
PLC user program is designed according to the control system of the process control requirements,
PLC programming language through the preparation of specifications, in accordance with the actual needs of the use of the function to design.
As long as the user can master some kind of standard programming language,
To be able to use PLC in the control system,
To achieve a variety of automatic control functions. Input and output points: 1024 points.
Input / output data points: 8192 points.
Program capacity: 60k.
Basic command processing speed (LD command) S:0.2.
PLC in the program execution stage: according to the order of the user program order to store the order of each instruction,
After the corresponding operation and processing, the result is written to the output status register,
The contents of the output status register are changed with the execution of the program.
Output refresh phase: when all instructions are executed,
The output status register is sent to the output latch in the output refresh stage,
And through a certain way (relay, transistor or transistor) output, drive the corresponding output equipment.
GT1555-QSBD Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=GT1555-QSBD&select=5