Open collector output.
Axis of control: 1.
Maximum output pulse: pulse/s 200k.
Location data: 600 data / axis.
Max link distance: 2m.
With the parameter setting, the synchronization control can be easily realized. Do not need to write complex procedures.
Start / stop with synchronous control of the shaft.
Synchronous control of the axis and the positioning of the axis can coexist.
Through the clutch, the movement of the main shaft can be transferred to the output shaft
AJ65SBTB32-16DR
Simple implementation of synchronization control.
Cam control is more simple
Cam data can easily create a variety of patterns.
Can be simple to achieve the gear, shaft, transmission, cam and other mechanical mechanisms to replace the software synchronization control.
It is not subject to the limitation of the concept of the electronic cam control so far, and can use the cam with high degree of freedom.
The stroke, speed, acceleration and beat can be confirmed on the graph, and the setting is carried out at the same time.
Can also be through the cam data thumbnail display, easy to confirm the cam data has been created.
Can import and export the cam data in CSV format. Input points: 16 points.
Voltage: DC12/24V.
Current: 4/10mA.
Response time: 10ms.
32 points / a common end.
Negative utility.
20 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
AJ65SBTB32-16DR Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=AJ65SBTB32-16DR&select=5