Input and output points: 96 points.
Input points: 48 points.
Input specifications: drain / source.
Output points: 48 points.
Output form: transistor output (source).
Power consumption: 14W.
Weight: 0.35KG.
Outline dimension: 85.4x90x87mm.
Hard and compact type third generation micro programmable controller.
Connector type input and output type provincial connection.
Greatly strengthened the industry''s highest level of high-speed processing and positioning and other built-in features
AC30R4-PUS
High cost of the province space models.
FX3UC in the province of space, the province also greatly strengthened the connection of high-speed processing and positioning and other built-in features.
The host is built in DC24V power supply, the connector input and output form of the transistor output.
In addition, according to the product mix can also achieve network communications, analog control, data collection and other functions.
Third generation high function micro programmable controller.
Connector type can save space, province wiring.
Built in high speed processing and positioning.
Ultra small size, control points to 256 points.
Construction of CC-Link remote I/O 384 points. Input points: 32 points.
Voltage: AC200 ~ 240V.
Current: 10mA.
Response time: 25ms.
32 points / a common end..
38 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
AC30R4-PUS Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=AC30R4-PUS&select=5