LK Automation Limited LK Automation Limited
Brand Sort: MITSUBISHI
Home >> Price
A970GOT-SBA Market price | A970GOT-SBA Introduction
  • Brand: MITSUBISHI
  • Country: JAPAN
  • Name: 10 inch man machine interface
  • Model: A970GOT-SBA
  • Price: U.S.$ 762.71
MITSUBISHI A970GOT-SBA
Input voltage: AC100 ~ 120V/AC200 ~ 240V.
Output voltage: DC5V.
Output current: 8A.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference A970GOT-SBA Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC. Type: HC-PQ type.
Output power: 0.05kw.
Rated speed: 3000r/min.
Electromagnetic brake: there.
Key axis: straight shaft.
Motor aspects: the material, structure and processing technology of the servo motor is much higher than that of AC motor,
That is when the driver output current, voltage, frequency change is fast power supply,
The servo motor can change according to the change of the response of the power supply,
Response characteristics and anti overload capacity is much higher than the AC motor drive,
Motor aspects of the serious differences between the two are fundamentally different performance.
That is not the inverter output can not change so fast power signal,
But the motor itself can not react,
So in the frequency of the internal algorithm set to protect the motor to do the corresponding overload.
Of course, even without the ability to set the output of the inverter is limited,
Some of the excellent performance of the inverter can be directly driven servo motor. 5 slots.
Requires 1 power modules.
Used to install the old section of the large A series PLC module.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
A970GOT-SBA Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=A970GOT-SBA&select=5


...more relevant model market price >>>>
Related products