Function: high performance and low price in the middle end model.
Picture size: 12.1 inches.
Resolution: SVGA.
Display: TFT color.
Open frame type.
Panel color: black.
Power type: DC24V.
Middle end model of high performance and low price.
GT25 standard supports SD memory card and standard equipped with Ethernet, RS-232, RS-422/485, host/device USB interface.
Even in the log, script, alarm, soft component data transmission, such as high load processing period, but also to achieve smooth operation of the screen
A3NCPUP21-S3
Connect GOT front USB interface and computer,
Can be through the FA, the GOT machine programming, start and adjust the operation,
Save the trouble of opening the control cabinet and changing the cable.
1, USB interface: device USB machine (Mini-B USB)
Can connect to the computer to transfer data.
2, USB interface: host USB (USB-A)
USB data can be transmitted through the USB memory or read log data, such as the GOT data, but also can be connected to the use of the mouse, keyboard.
3, the extension of the interface
Communication module and optional module can be installed.
4, Ethernet interface
Up to 4 different manufacturers can be connected at the same time
FA machine.
5, RS-232 interface
Can connect all kinds of FA machine, bar code reader, serial printer.
6, RS-422/485 interface
Can be connected to a variety of FA machines, bar code reader.
7, SD memory card slot
Can save alarm and log data, such as a large number of data. Connecting cable for handheld GOT and PLC.
Cable length: 1.5 meters.
Application: RS-422 connection (A/QnA series). Twisted pair cable.
Single bus.
Remote I/O station.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
A3NCPUP21-S3 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=A3NCPUP21-S3&select=5