LK Automation Limited LK Automation Limited
Brand Sort: MITSUBISHI
Home >> Price
A0J2-C04B Market price | A0J2-C04B Introduction
MITSUBISHI A0J2-C04B
MITSUBISHI inverter series: FR-F842.
Voltage level: three phase 400V.
Power: 355kw.
SLD converter rated current: 770A.
Structure and function: the rectification part is off type.
Type: CA.
Substrate coating: have.
Energy saving by high efficiency motor.
Reduce standby power consumption.
DC24V external power supply, the input MC signal can be stopped after the motor for the OFF, in the motor drive for the ON A0J2-C04B
Standby power management can be carried out by means of frequency converter to realize the power consumption reduction of standby time.
According to the temperature of the inverter cooling fan, the operation of the inverter can be controlled.
According to the operating conditions of the inverter cooling fan output the corresponding signal,
Therefore, the inverter and other built-in fan and inverter cooling fan synchronous operation.
Can reduce the power consumption in the stop. Enter points: 64 points.
Voltage: DC12/24V.
Current: 3/7mA.
Response time: 10ms.
32 points / a common end.
Negative utility.
37 pin connector.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
A0J2-C04B Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=A0J2-C04B&select=5


...more relevant model market price >>>>
Related products
MITSUBISHI
Relay output module
A0J2-E24R
MITSUBISHI Relay output module A0J2-E24R
Output points: 24 points. Voltage: DC24V
MITSUBISHI
CPU unit
A0J2CPU
MITSUBISHI CPU unit A0J2CPU
Input and output points: 480 points. Pro
MITSUBISHI
DC input / transistor output module
A0J2-E28DT
MITSUBISHI DC input / transistor output module A0J2-E28DT
Input points: 16 points. Input voltage a