The length of the line: 5M.
IP level: IP65.
Direct type.
Bending life: standard.
Connector kit for motor electromagnetic brake.
Cable for electromagnetic brake, for HF-KP/HF-MP series (motor shaft with side extraction). Cable length: 3m.
For printer and GOT (print unit) between the connection, HandyGOT, GT10, GT27, GT25, GT23, GT21. Function: input / output module (internal service power supply).
Input / output points: 32 points
Input points: 16 points
IS74-0.75K-CHT
Output points: 16 points.
DC5V internal consumption current: 965mA.
DC24V internal consumption current: 250mA.
Input / output mode: DC input (drain / source) / transistor (drain).
In order to extend the input output of the device.
Also has a built-in power supply products.
The maximum number of points for the input and output is 256.
Expansion module: up to 16 units (in addition to the power expansion module)
The total number of CC-Link, AnyWireASLINK, and Bitty series of remote I/O is 512 points. Output type: transistor output, drain type.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function.
Rated load voltage / current: DC24V/0.1A.
External connection: 1 wire.
MIL connector type.
Minimum size of industry.
Relay terminal, terminal station conversion module and electromagnetic valve, etc. are connected to a simple MIL connector.
Simply remove the connector can be replaced with a simple module.
Additional module power supply, I/O power sharing.
No additional I/O power supply, you can reduce the cost and set space. NSD servo system.
A73CPU (P21/R21) -S3 dedicated.
Relay output interface circuit of PLC
Working process: when the internal circuit output digital signal 1,
There is a current flowing through, the relay coil has a current, and then the normally open contact is closed,
Provide load current and voltage.
When the internal circuit outputs a digital signal 0, there is no current flowing through it,
The relay coil does not have a current, and the normally open contact is broken off,
A current or voltage that is disconnected from the load.
It is through the output interface circuit to the internal digital circuit into a signal to make the load action or not action.
When the programmer input programinto the user program memory,
Then CPU according to the function of the system (the system program memory to explain the compiler),
Translate the user program into PLC internally recognized by the user to compile the program.
I/O points is an important indicator of PLC.
Reasonable selection of I/O points can not only satisfy the control requirements of the system,
And the total investment of the system is the lowest.
The input and output points and types of PLC should be determined according to the analog quantity and switch quantity of the controlled object,
Generally an input / output element to take up an input / output point.
Taking into account the future adjustment and expansion,
In general should be estimated on the total number of points plus the amount of spare 20%~30%.
The following describes the centralized control system I/O points of the estimate.
IS74-0.75K-CHT Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=IS74-0.75K-CHT&select=5