Input type: DC input, positive common end.
Input points: 1 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/4mA.
Output form: transistor output, leakage type.
Output points: 1 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC24V/0.1A.
External connection: 3 line /2 line type.
Cable type.
Minimum size of industry
HG-JR22K1M
Can be like a cable, placed in the online slot.
The communication cable and the external equipment connecting cable is a type, and the wiring is simple.
Communication side, input and output side with cable (50cm). "Accessories for 10.4 inch models.
Applicable models: GT16, GT15. "MITSUBISHI general purpose AC servo amplifier MELSERVO-J2-Super series.
Rated output: 0.2kw.
Universal interface.
Voltage: single phase AC100V.
Super function, excellent performance.
High performance CPU integration, greatly improve product responsiveness.
Due to the application of high performance CPU, so that the response can be greatly improved.
Speed loop frequency response increased to more than 550HZ.
MR-J2-Super series is the best device for high speed positioning applications.
Easy adjustment.
Model adaptive control / advanced real time automatic tuning.MELSECNET/MINI (-S3) data link system, A2C system transfer converter.
Twisted pair cable -GI optical fiber cable.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
HG-JR22K1M Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=HG-JR22K1M&select=5