Max input / output points: 48 points.
Supply voltage: 100 - 240VAC.
Input points: 24 points.
Output points: 24 points.
Output type: relay.
Power consumption: 50VA.
Weight (kg):0.85.
Size (WxHxD) mm:182x90x87.
Note recording function, Component annotation can be recorded in the program register.
Online program editor, online change the program will not lose the working hours or stop production operation
FR-F740P-5.5K-CHT
RUN/STOP switch, running on panel / stop switch easy to operate.
Remote maintenance, remote programming software can monitor, upload or uninstall programs and data via modem communications
Password protection, using a eight digit password to protect your program.
Clock function and hour meter function, all of the PLC FX2N has a real-time clock standard.
Continuous scanning function, to define the operation cycle for the application of the continuous scan time.
Input filter adjustment function, you can use the input filter to smooth the input signal (in the basic unit x000 to x017). A7HGP/A6GPP-CPU connection.
Length: 30m. Analog channel: 12 channels.
Input / output (resolution): 0 ~ 4000.
Conversion speed: 100ms/12 channel.
Analog module installation.
Power supply: AC85 ~ 132V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
FR-F740P-5.5K-CHT Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=FR-F740P-5.5K-CHT&select=5