MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment
A985GOT-TBA-EU
Usually only need to modify the part of the program can be. CC-Link (remote device station).
Twisted pair. Axis of control: 1.
Instruction speed: 1Hz~1MHz.
Applicable PLC:FX1N, FX2N, FX3U, FX2NC (to FX2NC-CNV-IF).
Applicable PLC:FX3UC (to FX2NC-CNV-IF or FX3UC-1PS-5V).
The maximum 1MHz high speed pulse, can carry on the high speed, high precision positioning.
Can be in the range of 1Hz to 1Hz~1MHz as the interval output pulse.
The high speed moving time can be shortened to 1ms by using a dedicated start input.
Enhanced speed control function.
Support the approximate S type of acceleration and deceleration function, form operation function, through the maximum 30kHz of the external input pulse rate of synchronization operation, etc.. Input points: 16 points.
Input voltage and current: 3/7mA DC12/24V.
Input response time: 10ms.
16 point /1 a public side.
Positive pole sharing.
Output points: 16 points.
Output voltage: DC12/24V.
OFF leakage current: 0.1mA.
Output response time: 2ms.
16 point /1 a public side.
Output type: transistor output (type sink).
With the surge absorber.
50 point terminal station.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor.
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc..
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process.
Control solenoid valve required I/O points by the action principle of the solenoid valve can be known,
A single coil solenoid valve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 output, band switch,
Several bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points.
A985GOT-TBA-EU Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=A985GOT-TBA-EU&select=5