LK Automation Limited LK Automation Limited
Brand Sort: MITSUBISHI
Home >> Price
A0J2E-E24T Market price | A0J2E-E24T Introduction
MITSUBISHI A0J2E-E24T
Input type: DC input, positive common end.
Input points: 8 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type.
Output points: 8 points.
OFF leakage current: 0.25mA.
Output protection function.
Rated load voltage / current: DC24V/0.5A.
External connection: 4 wire.
Fast connector type.
Simple wiring through quick connector A0J2E-E24T
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Display characters: 16 x 4 character line width.
Display character: English letters and numbers (full / half), Katakana (full / half), hiragana (angle), (angle), symbol Chinese characters (full / half).
Language switch: Chinese / english.
Backlight display: green (normal), red (abnormal).
Weight 0.03kg. Screw, 2 piece type terminal.
Current output module.
Number of channels: 4 channels.
Number of stations: 2 stops.
Station type: remote equipment station.
High speed data transfer of up to 10Mbps;
The development of CC-LINK is not only to meet the control of high speed remote I/O,
But also to meet the high speed of the field of information control.
In order to achieve this goal, the transmission speed of CC-LINK is compared with that of the previous live network system to add 40 to 10Mbps.
Such a high speed can not affect the speed of the machine control while allowing a large number of data communication. Input points: 16 points.
Voltage: AC200 ~ 240V.
Current: 10mA.
Response time: 25ms.
16 points / a common end..
20 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
A0J2E-E24T Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=A0J2E-E24T&select=5


...more relevant model market price >>>>
Related products