Category: Master station.
Transfer speed: 125kbps/250kbps/500kbps/1Mbps.
Transmission line form: bus system.
Total distance: 125kbps:1000m/250kbps:800m/500kbps:480m/1Mbps:240m.
The maximum connection units: 32.
Total points: input + output <=2048 point.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures A3NCPUP21 datasheet PDF catalog A3NCPUP21 PDF datasheet.
These procedures are relatively independent, generally in the basic completion of the program design and then add
A3NCPUP21
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations. DC input points: 16 points.
Input voltage and current: 3/7mA, DC12/24V A3NCPUP21 datasheet PDF catalog A3NCPUP21 PDF datasheet.
Response time: 10ms.
Positive pole sharing.
16 point /1 a public side.
Bidirectional thyristor output points: 12 points.
Output voltage and current: AC100 ~ 240V, 0.6A/1 point, 2.4A/1 public end.
Response time: 0.5Hz1ms.
8 point /1 a public end, 4 point /1 a public end.
36 point terminal station.
Number of stations: 4 stops.
Compact remote I/O unit.
Equipment layer / field bus CC-Link device layer is the PLC and other control devices and sensors and drive devices connected to the field network,
Network for the lowest layer of the whole network system A3NCPUP21 datasheet PDF catalog A3NCPUP21 PDF datasheet.
Using CC-Link field bus connection, the number of wiring is greatly reduced,
Improve the maintainability of the system.
And, not just the amount of data ON/OFF and other switches,
Can also be connected to the ID system, bar code reader, inverter, man-machine interface and other intelligent devices,
From the completion of a variety of data communication, the management of the terminal production information can be realized,
On the centralized management of the state of the machine movement,
Make maintenance work efficiency also greatly improved.
Q series PLC in the use of CC-Link function better,
And easier to use.
Mitsubishi Co PLC network inherited the traditional use of the MELSEC network,
And make it better in terms of performance, function, easy to use etc..
Provides a layer of three layers of clear network, to provide the most suitable network products for a variety of uses.
The information layer /Ethernet (Ethernet) information layer is the highest level of the network system,
Mainly in the PLC, the device controller and production management with PC transmission between production management information, quality management information and the operation of equipment, etc.,
Information layer using the most common Ethernet.
It is not only able to connect the PC system UNIX, windows system, etc.,
And can connect a variety of FA devices.
The Ethernet module has the function of Internett e-mail receiving and sending,
The user can send and receive the production information conveniently in any place of the world,
Build a remote monitoring management system A3NCPUP21 datasheet PDF catalog A3NCPUP21 PDF datasheet.
At the same time, tthe use of the Internet FTP server functions and MELSEC protocol can be very easy to achieve the program upload / download and transfer of information A3NCPUP21 datasheet PDF catalog A3NCPUP21 PDF datasheet.