LK Automation Limited LK Automation Limited
Download Sort: MITSUBISHI
Home >> Catalog Download
MITSUBISHI A1SJ71PB93D datasheet PDF catalog A1SJ71PB93D PDF datasheet
Product model: A1SJ71PB93D
Name: Communication module
Brand: MITSUBISHI
Sort: PDF datasheet
File language: English
3C-2V/5C-2V coaxial cable.
Single bus.
PC inter network (management station / common station) / remote I/O network (remote control station).
How to choose MITSUBISHI PLC.
MITSUBISHI PLC options include the choice of MITSUBISHI PLC models, capacity, I/O module, power, etc..
MITSUBISHI PLC distribution I/O points and design MITSUBISHI PLC peripheral hardware circuit
Draw the I/O point of the PLC and the input / output device connection diagram or the corresponding table,
This part also can be carried out in second steps A1SJ71PB93D datasheet PDF catalog A1SJ71PB93D PDF datasheet A1SJ71PB93D
Design PLC peripheral hardware circuit.
Draw the electrical wiring diagram of the other parts of the system,
Including the main circuit and the control circuit does not enter the PLC, etc A1SJ71PB93D datasheet PDF catalog A1SJ71PB93D PDF datasheet. .
The electrical schematic diagram of the system composed of I/O PLC connection diagram and PLC peripheral electrical circuit diagram.
So far the system''s hardware electrical circuit has been determined. A65B/A68B/A55B/A58B connection cable.
Length: 400mm. Pulse input: differential input.
Default input: DC input.
Count range: 0~16777215.
Number of stations: 4 stops.
Station type: remote equipment station A1SJ71PB93D datasheet PDF catalog A1SJ71PB93D PDF datasheet.
Configuration of master / local station,
In addition to the other site network with different CC-Link in addition to the main station and the remote station configuration can also be the main station and the local station configuration.
A local PLC can communicate with the master station PLC and other remote workstations.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debuggging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp by step A1SJ71PB93D datasheet PDF catalog A1SJ71PB93D PDF datasheet A1SJ71PB93D datasheet PDF catalog A1SJ71PB93D PDF datasheet.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
Related products