LK Automation Limited LK Automation Limited
Download Sort: MITSUBISHI
Home >> Manual Download
MITSUBISHI A9GT-RS4 Manual A9GT-RS4 User's Manual
Product model: A9GT-RS4
Name: Serial Communication board
Brand: MITSUBISHI
Sort: User's Manual
File language: English
Input voltage range: DC24V.
Output voltage: DC5V.
Output current: 2.5A.
I/O points is an important indicator of PLC.
Reasonable selection of I/O points can not only satisfy the control requirements of the system,
And the total investment of the system is the lowest.
The input and output points and types of PLC should be determined according to the analog quantity and switch quantity of the controlled object,
Generally an input / output element to take up an input / output point A9GT-RS4 Manual A9GT-RS4 User's Manual A9GT-RS4
Taking into account the future adjustment and expansion,
In general should be estimated on the total number of points plus the amount of spare 20%~30%.
The following describes the centralized control system I/O points of the estimate A9GT-RS4 Manual A9GT-RS4 User's Manual.
Relay output interface circuit of PLC
Working process: when the internal circuit output digital signal 1,
There is a current flowing through, the relay coil has a current, and then the normally open contact is closed,
Provide load current and voltage.
When the internal circuit outputs a digital signal 0, there is no current flowing through it,
The relay coil does not have a current, and the normally open contact is broken off,
A current or voltage that is disconnected from the load A9GT-RS4 Manual A9GT-RS4 User's Manual.
It is through the output interface circuit to the internal digital circuit into a signal to make the load action or not action. DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
8 point /1 a public side.
Positive / negative sharing.
24 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
Thhe basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program A9GT-RS4 Manual A9GT-RS4 User's Manual A9GT-RS4 Manual A9GT-RS4 User's Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
Related products
MITSUBISHI
Q bus connecting cable
A9GT-QC200BS
MITSUBISHI Q bus connecting cable A9GT-QC200BS
Cale length: 20 meters. For QCPU and GO
MITSUBISHI
Memory card
A9GT-QFNB
MITSUBISHI Memory card A9GT-QFNB
Optional features of memory card Q/QnA/
MITSUBISHI
Bus connecting plate
A9GT-50WQBUSS
MITSUBISHI Bus connecting plate A9GT-50WQBUSS
QCPU Q mode us connection. 1 joint. A
MITSUBISHI
Serial communication board
A9GT-RS2
MITSUBISHI Serial communication board A9GT-RS2
RS-232C connection QCPU direct connecti