LK Automation Limited LK Automation Limited
Download Sort: MITSUBISHI
Home >> Manual Download
MITSUBISHI A985GOT-TBD-V Extended/Option Functions Manual Manual A985GOT-TBD-V Operating Manual
Product model: A985GOT-TBD-V
Name: touch screen
Brand: MITSUBISHI
Sort: Extended/Option Functions Manual Operating Manual
File language: English
Input type: DC input, positive public end / negative public end.
Input points: 16 points.
Enter the response time: 0.2ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 1 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup A985GOT-TBD-V Extended/Option Functions Manual Manual A985GOT-TBD-V Operating Manual A985GOT-TBD-V
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool. Cable length: 20.6 meters.
Small CPU long distance connecting cable.
For QnAS/AnSCPU/ motion control and GOT connection.
For connection between A7GT-CNB and GOT A985GOT-TBD-V Extended/Option Functions Manual Manual A985GOT-TBD-V Operating Manual.
Combination A8GT-EXCNB and A8GT-C_BS. For A6TBXE/A6TBY36E/A6TBX54E/A6TBY54E/A6TBX70E (common cathode; source) long 1m.DC input points: 16 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
16 point /1 a public side.
Positive / negative sharing.
40 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered A985GOT-TBD-V Extended/Option Functions Manual Manual A985GOT-TBD-V Operating Manual.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program A985GOT-TBD-V Extended/Option Functions Manual Manual A985GOT-TBD-V Operating Manual A985GOT-TBD-V Extended/Option Functions Manual Manual A985GOT-TBD-V Operating Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
Related products
MITSUBISHI
12 inch man machine interface
A985GOT-TBA
MITSUBISHI 12 inch man machine interface A985GOT-TBA
Series Name: A985GOT. Size: 12 inches. R
MITSUBISHI
12 inch man machine interface
A985GOT-TBD-V
MITSUBISHI 12 inch man machine interface A985GOT-TBD-V
Series Name: A985GOT-V. Size: 12 inches.
MITSUBISHI
12 inch man machine interface
A985GOT-TBA-EU
MITSUBISHI 12 inch man machine interface A985GOT-TBA-EU
Series Name: A985GOT. Size: 12 inches. R
MITSUBISHI
12 inch man machine interface
A985GOT-TBA-V
MITSUBISHI 12 inch man machine interface A985GOT-TBA-V
Series Name: A985GOT-V. Size: 12 inches.