LK Automation Limited LK Automation Limited
Download Sort: MITSUBISHI
Home >> Manual Download
MITSUBISHI A2NCPUR21-S1 Manual A2NCPUR21-S1 User's Manual
Product model: A2NCPUR21-S1
Name: PLC
Brand: MITSUBISHI
Sort: User's Manual
File language: English
CPU connection program input device.
ACPU use. Output type: transistor output, drain type.
Output points: 8 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC12V/DC24V/0.5A.
External connection: 2 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup A2NCPUR21-S1 Manual A2NCPUR21-S1 User's Manual A2NCPUR21-S1
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool. DC input points: 4 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
4 point /1 a public side A2NCPUR21-S1 Manual A2NCPUR21-S1 User's Manual.
Positive / negative sharing.
16 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system A2NCPUR21-S1 Manual A2NCPUR21-S1 User's Manual.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Cable length 10m; used in A6TE2-16SRN.Input type: DC input, negative public end.
Input pooints: 32 points A2NCPUR21-S1 Manual A2NCPUR21-S1 User's Manual.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 3 wire.
Sensor connector type (E-CON type).
Using industry standard E-CONN type A2NCPUR21-S1 Manual A2NCPUR21-S1 User's Manual.
Simple wiring through sensor connector.
When installing the module can choose to use the DIN guide rail or screw mounting.
3 wire sensor input.
Related products
MITSUBISHI
CPU unit
A2NCPUP21-S1
MITSUBISHI CPU unit A2NCPUP21-S1
Input and output points: 1024 points. In
MITSUBISHI
CPU unit
A2NCPUR21
MITSUBISHI CPU unit A2NCPUR21
Input and output points: 512 points. Inp
MITSUBISHI
CPU unit
A2NCPUP21-S4
MITSUBISHI CPU unit A2NCPUP21-S4
Input and output points: 1024 points. In
MITSUBISHI
CPU unit
A2NCPUP21-S3
MITSUBISHI CPU unit A2NCPUP21-S3
Input and output points: 512 points. Inp