Output type: transistor output, drain type.
Output points: 32 points.
OFF leakage current: 0.25mA.
Output protection function.
Rated load voltage / current: DC12V/DC24V/0.5A.
External connection: 1 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup AJ71C24-S3 datasheet PDF catalog AJ71C24-S3 PDF datasheet.
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool
AJ71C24-S3 Input and output points: 256 points.
Input / output data points: 256 points.
Program capacity: 6k.
Basic command processing speed (LD command) s:1.0.
Internal storage RAM memory capacity: 16k AJ71C24-S3 datasheet PDF catalog AJ71C24-S3 PDF datasheet.
User program storage capacity: it is a measure of how much the user application can store the number of indicators.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General logical operation instructions each account for 1 words. Timer / counter,
Shift instruction accounted for 2 words AJ71C24-S3 datasheet PDF catalog AJ71C24-S3 PDF datasheet. Data operation instructions for 2~4.
Integral type: the PLC components are installed together or a few pieces of printed circuit board,
And together with the power supply installed in the casing to form a single overall called the host or the basic unit, small, ultra small PLC using this structure.
Modular: PLC is the basic components of a separate module.
Medium and large PLC used this way. Easy maintenance. A set of 5 (LOGO removable, man-machine interface provides one).
Applicable model: A956WGOT. 3C-2V/5C-2V coaxial cable.
Double loop.
Remote station.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the genneral need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system AJ71C24-S3 datasheet PDF catalog AJ71C24-S3 PDF datasheet.
The main contents of the initialization program arre: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc AJ71C24-S3 datasheet PDF catalog AJ71C24-S3 PDF datasheet. .