Input / output points: 4096 points.
You can use the CF card.
Version OS:VxWorks 5.4.
Easy connection programming tool via ethernet.
Programming tools (Works2 GX, Developer GX) and CPU direct connection (1 to 1),
No need to carry out the IP address settings. And there is no need to select the cable, the straight line and the cross line can be used Q13UDVCPU Special Instructions Manual Q13UDVCPU Strctured Programming Manual
Q13UDVCPU
Therefore, this connection method and the use of USB, can easily communicate with the CPU,
Even the operators are not familiar with the network settings can easily establish a connection.
Easy connection through the hub CPU.
By using an Ethernet hub, programming tools and multiple CPU can be connected simultaneously.
Through the programming tool can be searched and displayed in the list has been connected to the CPU Q13UDVCPU Special Instructions Manual Q13UDVCPU Strctured Programming Manual.
Therefore, even if the IP CPU address is unknown, just choose from this list, you can easily connect.
Seamless communication without network level constraints.
With the latest high-speed, large capacity IE CC-Link controller network and IE CC-Link field network,
Corresponding to the increasing amount of information.
Together with previous MELSECNET/H, Ethernet and CC-Link,
These networks can be across the network type or level of differences, to achieve seamless communication Q13UDVCPU Special Instructions Manual Q13UDVCPU Strctured Programming Manual.
Programmable logic controller on the network through the programming tool of the Ethernet connection,
Monitoring and programming.Three-phase 4 wire type.
Measuring circuit number: 3 circuits.
Measurement items: power consumption (consumption, regeneration), current, voltage, power, power factor, etc..
Power measurement module product group capable of simply measuring various energy information.
With only one module can be used to measure and power consumption (consumption and regeneration), reactive power, current, voltage, power, power factor and frequency of all kinds of detailed information.
No ladder program can continue to monitor the minimum and maximum values, can also perform 2 types of upper / lower limit alarm.
Only in the ON state can be used to measure the output of the output device.
Therefore, the amount of electricity and the quantity of electricity in the unit of the beat can be obtained during the operation of the equipment.
3 phase 3 wire products can be used to measure up to 4 circuits in one slot,
3 phase 4 wire produccts can be used to measure up to 3 circuits,
So the electrical energy measurement can be carried out in a small space by the multi circuit products Q13UDVCPU Special Instructions Manual Q13UDVCPU Strctured Programming Manual.
For example, a module ccan be used to measure other loads from the control panel trunk Q13UDVCPU Special Instructions Manual Q13UDVCPU Strctured Programming Manual.
In addition, Works2 GX (version 1.90U and higher) can be used to easily set parameters.