LK Automation Limited LK Automation Limited
Download Sort: MITSUBISHI
Home >> Manual Download
MITSUBISHI Q02CPU-A PID Control Instructions Manual Q02CPU-A Programming Manual
Product model: Q02CPU-A
Name: PLC
Brand: MITSUBISHI
Sort: PID Control Instructions Programming Manual
File language: English
The telephone line of the interface module is connected with the peripheral equipment.Master station.
Support DB A20 AnyWire system.
DB A20 AnyWire system uses a separate transmission mode,
Sensor networks to achieve high speed and high reliability.
The transmission distance of 50m/200m/1km/3km can be selected Q02CPU-A PID Control Instructions Manual Q02CPU-A Programming Manual.
1 modules can be up to 512 points of the input, 512 points of output (standard setting) Q02CPU-A
Even branch wiring, but also to detect transmission lines.5 slots.
Requires 1 power modules.
Used to install the old section of the large A series PLC module.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order Q02CPU-A PID Control Instructions Manual Q02CPU-A Programming Manual.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh Q02CPU-A PID Control Instructions Manual Q02CPU-A Programming Manual.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomeena, i Q02CPU-A PID Control Instructions Manual Q02CPU-A Programming Manual. e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation Q02CPU-A PID Control Instructions Manual Q02CPU-A Programming Manual.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
Related products
MITSUBISHI
A mode Q series CPU
Q06HCPU-A
MITSUBISHI A mode Q series CPU Q06HCPU-A
Input / output points: 4096 points. Num
MITSUBISHI
A mode Q series CPU
Q02HCPU-A
MITSUBISHI A mode Q series CPU Q02HCPU-A
Input / output points: 4096 points. Num
MITSUBISHI
A mode Q series CPU
Q02CPU-A
MITSUBISHI A mode Q series CPU Q02CPU-A
Input / output points: 4096 points. Num
MITSUBISHI
High performance CPU
Q02CPU
MITSUBISHI High performance CPU Q02CPU
Program capacity: 28K step. Input / outp