Fast connector type.
Voltage input.
Number of channels: 8 channels.
Occupied the number of stations: Ver.1 mode occupied 3 stations, Ver.2 mode occupied 1 stations.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction AJ71QBR11 Hardware Manual AJ71QBR11 User's Manual
AJ71QBR11
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced AJ71QBR11 Hardware Manual AJ71QBR11 User's Manual.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step AJ71QBR11 Hardware Manual AJ71QBR11 User's Manual.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be. MELSECNET/MINI (-S3) data link system, A2C system transfer converter.
Plastic fiber cable -SI optical fiber cable.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of programm simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program AJ71QBR11 Hardware Manual AJ71QBR11 User's Manual AJ71QBR11 Hardware Manual AJ71QBR11 User's Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.