The use of A1STA32 can significantly reduce the wiring time I/O 32 type of connector assembly,
Neither welding, without thread stripping,
It only needs to cut a wire and insert the wire into the terminal hole of the A1STA32,
A1STA32 in the blade will cut wire insulation surface,
To make contact and hold a good conductor A985GOT-TBD-V SW4D5C-GOTR-PACKE compatible Connection System Manual Manual A985GOT-TBD-V User's Manual
A985GOT-TBD-V Screw, 2 piece type terminal
Temperature measuring resistor body input module.
Number of channels: 4 channels.
Number of stations: 1 stops.
Station type: remote equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step A985GOT-TBD-V SW4D5C-GOTR-PACKE compatible Connection System Manual Manual A985GOT-TBD-V User's Manual.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction A985GOT-TBD-V SW4D5C-GOTR-PACKE compatible Connection System Manual Manual A985GOT-TBD-V User's Manual.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced. SI/QSI/H-PCF/ wide range H-PCF fiber optic cable.
Double loop.
PC inter network (management station / station) / remote I/O network (remote control station).
How to choose MITSUBISHI PLC.
MITSUBISHI PLC options include the choice of MITSUBISHI PLC models, capacity, I/O module, power, etc..
MITSUBISHI PLC distribution I/O points and design MITSUBISHI PLC peripheral hardware circuit
Draw the I/O point of the PLC and the input / output device connection diagram or the corresponding table,
This part also can be carried out in second steps.
Design PLC peripheral hardware circuit.
Draw the electrical wiring diagram of the other parts of the system,
Including the main circuit and the control circuit does not enter the PLC, etc A985GOT-TBD-V SW4D5C-GOTR-PACKE compatible Connection System Manual Manual A985GOT-TBD-V User's Manual. .
The electrical schematic diagram of the system compoosed of I/O PLC connection diagram and PLC peripheral electrical circuit diagram A985GOT-TBD-V SW4D5C-GOTR-PACKE compatible Connection System Manual Manual A985GOT-TBD-V User's Manual.
So far the system''s hardware electrical circuit has been determined.