Applicable model: A975/970/960GOT (-B).Input type: DC input, positive common end.
Input points: 8 points.
Enter the response time: 10ms the following.
Rated input voltage / current: DC24V/7mA.
Output form: transistor output, leakage type.
Output points: 8 points.
OFF leakage current: 0.1mA.
Output protection function: No A985GOT-TBD-V Connection System Manual Manual A985GOT-TBD-V User's Manual.
Rated load voltage / current: DC12V/DC24V/0
A985GOT-TBD-V5A.
External connection: 1 line /1 line type.
Type of input and output terminal.
Using 2 pieces of structure of the terminal units, maintenance can be maintained in the same line under the condition of the replacement module. RS-232 1 channels.
With DC input 2 points.
Transistor output 2.
Number of stations: 1 stops.
Station type: intelligent equipment station A985GOT-TBD-V Connection System Manual Manual A985GOT-TBD-V User's Manual.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step A985GOT-TBD-V Connection System Manual Manual A985GOT-TBD-V User's Manual.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced. Data communication line module (optical cable) Master / local station for A3VTS multiplex system
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
TThese procedures are relatively independent, generally in the basic completion of the program design and then add A985GOT-TBD-V Connection System Manual Manual A985GOT-TBD-V User's Manual.
MITSUBISHI PLC protection and chain procedures.
Protection aand chain is an indispensable part of the program, must be carefully considered A985GOT-TBD-V Connection System Manual Manual A985GOT-TBD-V User's Manual.
It can avoid the control logic confusion caused by illegal operations.