LK Automation Limited LK Automation Limited
Download Sort: MITSUBISHI
Home >> Manual Download
MITSUBISHI A975GOT-TBD-CH Hardware Manual A975GOT-TBD-CH User's Manual
Product model: A975GOT-TBD-CH
Name: Graphic Operation Terminal
Brand: MITSUBISHI
Sort: Hardware User's Manual
File language: English
Cable length: 6 meters
Extending cable to connect CPU main substrate and extended substrate,
According to the model can provide different cable length,
If you need to connect the AnN type expansion substrate is required,
Selection of A1SC05NB (A1SC07NB) cable. Output type: relay output.
Output points: 32 points A975GOT-TBD-CH Hardware Manual A975GOT-TBD-CH User's Manual.
OFF leakage current: -.
Output protection function: No A975GOT-TBD-CH
Rated load voltage / current: DC24V/AC240V/2A.
External connection: 1 wire.
A2C shape terminal.
Type of input and output terminal.
Shape and A2C input and output modules are identical (same mounting dimensions),
Machining and installing holes are not required. Input type: DC input, positive public end / negative public end.
Input points: 32 points A975GOT-TBD-CH Hardware Manual A975GOT-TBD-CH User's Manual.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 1 wire.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program A975GOT-TBD-CH Hardware Manual A975GOT-TBD-CH User's Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. 16 channels.
Input: DC-10 ~ 10V, DC-20 ~ 20mA.
38 point terminal station.
Analog quantity I/P multiplexing unit (isolation channel).
Detailed analysis of the process and work characteristics of the controlled object,
To understand the coordination between the controlled object machine, electricity and liquid,
The control requirements of the controlled object for MITSUBISHI PLC control system are put forward,
Determine the control prrogram, to develop a design task book A975GOT-TBD-CH Hardware Manual A975GOT-TBD-CH User's Manual.
How to determine the input / output device of MITSUBISHI plc.
According to the control requirements of the system,
All input devices and output devicees required for the determination of the system,
To determine the input / output device related to the MITSUBISHI PLC,
To determine the I/O PLC points A975GOT-TBD-CH Hardware Manual A975GOT-TBD-CH User's Manual.