LK Automation Limited LK Automation Limited
Download Sort: MITSUBISHI
Home >> Manual Download
MITSUBISHI A975GOT-TBD-CH Connection System Manual Manual A975GOT-TBD-CH User's Manual
Product model: A975GOT-TBD-CH
Name: touch screen
Brand: MITSUBISHI
Sort: Connection System Manual User's Manual
File language: English
Input type: DC input, positive common end.
Input points: 8 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type.
Output points: 8 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC24V/0 A975GOT-TBD-CH Connection System Manual Manual A975GOT-TBD-CH User's Manual. 5A A975GOT-TBD-CH
External connection: 3 line /2 line type.
Spring clip terminal.
Do not need to be tightened further or locked with screws, which can reduce the working hours of wiring.
Using 2 pieces of structure of the terminal units, maintenance can be maintained in the same line under the condition of the replacement module.
When installing the module can choose to use the DIN guide rail or screw mounting A975GOT-TBD-CH Connection System Manual Manual A975GOT-TBD-CH User's Manual.
Can be used for the 3 wire sensor input wiring. SI/QSI/H-PCF/ wide H-PCF optical cable double loop PC (control station / common station) / remote I/O network (remote master station). With external power supply function.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order A975GOT-TBD-CH Connection System Manual Manual A975GOT-TBD-CH User's Manual.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal whhich is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the usse of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on A975GOT-TBD-CH Connection System Manual Manual A975GOT-TBD-CH User's Manual A975GOT-TBD-CH Connection System Manual Manual A975GOT-TBD-CH User's Manual.
This phenomenon is called the I/O delay time effect.