LK Automation Limited LK Automation Limited
Download Sort: MITSUBISHI
Home >> Manual Download
MITSUBISHI A975GOT-TBA-EU Hardware Manual A975GOT-TBA-EU User's Manual
Product model: A975GOT-TBA-EU
Name: touch screen
Brand: MITSUBISHI
Sort: Hardware User's Manual
File language: English
For A6TBXE/A6TBY36E/A6TBX54E/A6TBY54E/A6TBX70E (common cathode; source) long 3m.3C-2V/5C-2V coaxial cable.
Single bus.
PC inter network (management station / station) / remote I/O network (remote control station).
How to choose MITSUBISHI PLC.
MITSUBISHI PLC options include the choice of MITSUBISHI PLC models, capacity, I/O module, power, etc A975GOT-TBA-EU Hardware Manual A975GOT-TBA-EU User's Manual A975GOT-TBA-EU .
MITSUBISHI PLC distribution I/O points and design MITSUBISHI PLC peripheral hardware circuit
Draw the I/O point of the PLC and the input / output device connection diagram or the corresponding table,
This part also can be carried out in second steps.
Design PLC peripheral hardware circuit.
Draw the electrical wiring diagram of the other parts of the system,
Including the main circuit and the control circuit does not enter the PLC, etc A975GOT-TBA-EU Hardware Manual A975GOT-TBA-EU User's Manual. .
The electrical schematic diagram of the system composed of I/O PLC connection diagram and PLC peripheral electrical circuit diagram.
So far the system''s hardware electrical circuit has been determined. Input points: 32 points.
Voltage: DC12/24V.
Current: 4/10mA.
Response time: 10ms.
8 points / a common end A975GOT-TBA-EU Hardware Manual A975GOT-TBA-EU User's Manual.
Cathode common.
38 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with thee change of the execution of the program A975GOT-TBA-EU Hardware Manual A975GOT-TBA-EU User's Manual.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to thhe adoption of centralized sampling A975GOT-TBA-EU Hardware Manual A975GOT-TBA-EU User's Manual.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.