MITSUBISHI A970GOT-TBA SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual Manual A970GOT-TBA Operating Manual
Product model: A970GOT-TBA
Name: touch screen
Brand: MITSUBISHI
Sort: SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual Operating Manual
File language: English
Close to input / output: 8 DC input or keyboard: 64 DC input, 16 transistor output.
Applicable models: A95_GOT (-M3) /A956WGOT. Input type: DC input, positive common end.
Input points: 16 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type A970GOT-TBA SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual Manual A970GOT-TBA Operating Manual A970GOT-TBA
Output points: 16 points.
OFF leakage current: 0.25mA.
Output protection function.
Rated load voltage / current: DC24V/0.1A.
External connection: 1 line /1 line type.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program A970GOT-TBA SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual Manual A970GOT-TBA Operating Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. DC input points: 2 points.
Input voltage and current: 7mA, DC24V.
Input response time: 10ms.
2 point /1 a public side A970GOT-TBA SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual Manual A970GOT-TBA Operating Manual.
Positive / negative sharing.
Output points: 2 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 4A/1 common end.
Output response time: 2ms.
2 point /1 a public side.
Output form: relay.
16 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitatte the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program A970GOT-TBA SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual Manual A970GOT-TBA Operating Manual A970GOT-TBA SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual Manual A970GOT-TBA Operating Manual.
Depending on the way the field signals are generated,