2 channels.
50kpps.
Count input signal: DC5/12/24V.
External input: DC5/12/24V.
Output: Transistor (open collector) 0.5A DC12/24V.
38 point terminal station.
How to determine the input / output device of MITSUBISHI plc.
According to the control requirements of the system,
All input devices and output devices required for the determination of the system,
To determine the input / output device related to the MITSUBISHI PLC,
To determine the I/O PLC points A950GOT-SBD-M3-B SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual Manual A950GOT-SBD-M3-B Operating Manual
A950GOT-SBD-M3-B
Detailed analysis of the process and work characteristics of the controlled object,
To understand the coordination between the controlled object machine, electricity and liquid,
The control requirements of the controlled object for MITSUBISHI PLC control system are put forward,
Determine the control program, to develop a design task book A950GOT-SBD-M3-B SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual Manual A950GOT-SBD-M3-B Operating Manual. Fast connector type.
Voltage input.
Number of channels: 8 channels.
Occupied the number of stations: Ver.1 mode occupied 3 stations, Ver.2 mode occupied 1 stations.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction A950GOT-SBD-M3-B SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual Manual A950GOT-SBD-M3-B Operating Manual.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC onlyy connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp by step A950GOT-SBD-M3-B SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual Manual A950GOT-SBD-M3-B Operating Manual A950GOT-SBD-M3-B SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual Manual A950GOT-SBD-M3-B Operating Manual.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.