I/O slots: 3 slots.
Outline dimension: 255*130.
CPU basic board can be plugged into 1 power modules,
1 CPU components and a maximum of 2, 3, 5, or 8 single slot size special function components and I/O components are respectively inserted and arranged.
Expansion ports are arranged on both sides of the base plate,
For connecting the expansion board for A950GOT-SBD-M3-B Hardware Manual A950GOT-SBD-M3-B User's Manual
A950GOT-SBD-M3-B
Up to 3 extension substrates. Cable length: 30 meters.
For QnA/A/FX (FX1, FX2, FX2C) CPU and GOT connection between.
For connection between FA-CNV_CBL and GOT.
For connection between FX-2PIF and GOT.
For connection between FX-422AW0 and GOT.
For serial communication module AJ71QC24 (N) -R4 and GOT connection between.
For connection between AJ65BT-G4-S3 and GOT A950GOT-SBD-M3-B Hardware Manual A950GOT-SBD-M3-B User's Manual. 16 channels.
Thermocouple input.
38 point terminal station.
How to determine the input / output device of MITSUBISHI plc.
According to the control requirements of the system,
All input devices and output devices required for the determination of the system,
To determine the input / output device related to the MITSUBISHI PLC,
To determine the I/O PLC points.
Detailed analysis of the process and work characteristics of the controlled object,
To understand the coordination between the controlled object machine, electricity and liquid,
The control requirements of the controlled object for MITSUBISHI PLC control system are put forward,
Determine the control program, to develop a design task book A950GOT-SBD-M3-B Hardware Manual A950GOT-SBD-M3-B User's Manual. Twisted pair cable.
Single bus.
MELSECNET/B (remote I/O station).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general nneed to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system A950GOT-SBD-M3-B Hardware Manual A950GOT-SBD-M3-B User's Manual.
The main contents of the initialization program arre: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc A950GOT-SBD-M3-B Hardware Manual A950GOT-SBD-M3-B User's Manual. .