LK Automation Limited LK Automation Limited
Download Sort: MITSUBISHI
Home >> Manual Download
MITSUBISHI A2ASCPU-S30 Manual A2ASCPU-S30 User's Manual
Product model: A2ASCPU-S30
Name: PLC
Brand: MITSUBISHI
Sort: User's Manual
File language: English
Series Name: A985GOT.
Size: 12 inches.
Resolution: 800 * 600.
Display equipment: high brightness TFT color display.
Display color: 256 color.
Power supply: AC100-240V.
Man machine interface (Machine Interaction Human, referred to as HMI), also known as the user interface or user interface,
Is a communication interface between human and computer,
Is an important part of the computer system A2ASCPU-S30 Manual A2ASCPU-S30 User's Manual A2ASCPU-S30
Is a medium for interaction and information exchange between the system and the user,
It realizes the transformation between the internal form of information and the acceptable form of human being.
Where there is a man-machine interface in the field of human computer information exchange. Input type: DC input, positive public end / negative public end A2ASCPU-S30 Manual A2ASCPU-S30 User's Manual.
Input points: 32 points.
Enter the response time: 0.2ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 1 wire.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program A2ASCPU-S30 Manual A2ASCPU-S30 User's Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Source type output module (standard type).Output points: 16 points.
Voltage: AC100 ~ 240V.
OFF leakage current: 3mA.
Output type: bidirectional controlled silicon.
8 points / a common end.
20 point terminal station.
With short circuit protection.
With the surge absorber.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should considerr the best performance to price ratio, a reasonable choice of PLC A2ASCPU-S30 Manual A2ASCPU-S30 User's Manual.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation A2ASCPU-S30 Manual A2ASCPU-S30 User's Manual.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
Related products
MITSUBISHI
CPU unit
A2ASCPU
MITSUBISHI CPU unit A2ASCPU
I/O points: 512. Processing speed: sec/
MITSUBISHI
CPU unit
A2ASCPU-S1
MITSUBISHI CPU unit A2ASCPU-S1
I/O points: 512. Processing speed: sec/
MITSUBISHI
CPU unit
A2ASCPU-S30
MITSUBISHI CPU unit A2ASCPU-S30
I/O points: 1024. Processing speed: sec/