LK Automation Limited LK Automation Limited
Download Sort: MITSUBISHI
Home >> Manual Download
MITSUBISHI A171SHCPUN Dedicated Instructions Manual A171SHCPUN Programming Manual
Product model: A171SHCPUN
Name: PLC
Brand: MITSUBISHI
Sort: Dedicated Instructions Programming Manual
File language: English
10BASE2.
For Q mode.
Control layer /MELSECNET/10 (H) is the middle layer of the whole network system,
Control network which is convenient and high speed processing data transmission between PLC, CNC and other control equipment.
As MELSEC control network MELSECNET/10,
With its good real-time performance, simple network settings, no procedures of the network data sharing concept,
As well as the redundant circuit and so on, has obtained the very high market appraisal,
The number of devices to reach the highest in japan,
In the world is also one of the few A171SHCPUN Dedicated Instructions Manual A171SHCPUN Programming Manual A171SHCPUN
And MELSECNET/H not only inherited the excellent characteristics of MELSECNET/10,
Also makes the network real-time better, more data capacity,
Further adapt to the needs of the market A171SHCPUN Dedicated Instructions Manual A171SHCPUN Programming Manual. Screw, 2 piece type terminal.
Voltage output module.
Number of channels: 4 channels.
Number of stations: 2 stops.
Station type: remote equipment station.
High speed data transfer of up to 10Mbps;
The development of CC-LINK is not only to meet the control of high speed remote I/O,
But also to meet the high speed of the field of information control.
In order to achieve this goal, the transmission speed of CC-LINK is compared with that of the previous live network system to add 40 to 10Mbps A171SHCPUN Dedicated Instructions Manual A171SHCPUN Programming Manual.
Such a high speed can not affect the speed of the machine control while allowing a large number of data communication. Applicable model: A956WGOT.Cable length: 30 meters.
PC to GOT long distance connection cable.
For connection between GOT and GOT. Output points: 8 points.
Output voltage and current: AC100 ~ 240V, 0.6A/1 point, 4A/1 public end.
Response time: 0.5Hz+1ms.
Output form: bidirectional thyristor output.
8 point /1 a public side.
26 point terminal station.
Number of stations: 1 stops.
Type remote I/O units outside of the panel (optical data connection).
Equipment layer / field bus CC-Link device layer is the PLC and other control devices and sensors and drive devices connected to the field network,
Network for the lowest layer of the whole network system.
Using CC-Link field bus connection, the number of wiring is greatly reduced,
Improve the maintainability of the system.
And, not just the amount of data ON/OFF and other switches,
Can also be connected to the ID system, bar code reader, inverter, man-machine interface and other intelligent devices,
From the completion of a variety of data communication, the management of the terminal production information can be realized,
On the centralized management of the state of the machine movement,
Make maintenance work efficiency also greatly improved.
Q series PLC in the use of CC-Link function better,
And easier to use.
Mitsubishi Co PLC network inherited the traditional use of the MELSEC network,
And make it better in terms of performance, function, easy to use etc..
Provides a layer of three layers of clear network, to provide the most suitable network products for a variety of uses.
The information layer /Ethernet (Ethernet) information layer is the highest level of the network system,
Mainly in the PLC, the device controller and production management with PC transmission between production management information, quality management information and the operation of equipment, etc.,
Information layer using the most common Ethernet.
It is not only able to connect the PC system UNIX, windows system, etc.,
And can connect a variety of FA devices.
The Ethernet module has the function of Internet e-mail receivinng and sending,
The user can send and receive the production information conveniently in any place of the world,
Build a remote monitoring management system A171SHCPUN Dedicated Instructions Manual A171SHCPUN Programming Manual.
At the same time, tthe use of the Internet FTP server functions and MELSEC protocol can be very easy to achieve the program upload / download and transfer of information A171SHCPUN Dedicated Instructions Manual A171SHCPUN Programming Manual.
Related products