DC input points: 8 points.
Input voltage and current: 7mA DC24V.
Response time: 10ms.
8 point /2 a public side.
Positive pole sharing.
26 point terminal station.
Number of stations: 1 stops.
Equipment layer / field bus CC-Link device layer is the PLC and other control devices and sensors and drive devices connected to the field network,
Network for the lowest laayer of the whole network system
AJ65SBTC4-16DT.
Using CC-Link field bus connection, the number of wiring is greatly reduced,
Improve the maintainability of the system AJ65SBTC4-16DT.
And, not just the amount of data ON/OFF and other switches,
Can also be connected to the ID system, bar code reader, inverter, man-machine interface and other intelligent devices,
From the completion of a variety of data communication, the management of the terminal production information can be realized,
On the centralized management of the state of the machine movement,
Make maintenance work efficiency also greatly improved AJ65SBTC4-16DT.
Q series PLC in the use of CC-Link function better,
And easier to use.
Mitsubishi Co PLC network inherited the traditional use of the MELSEC network,
And make it better in terms of performance, function, easy to use etc MITSUBISHI AJ65SBTC4-16DT..
Provides a layer of three layers of clear network, to provide the most suitable network products for a variety of uses.
The information layer /Ethernet (Ethernet) information layer is the highest level of the network system,
Mainly in the PLC, the device controller and production management with PC transmission between production management information, quality management information and the operation of equipment, etc MITSUBISHI AJ65SBTC4-16DT.,
Information layer using the most common Ethernet MITSUBISHI AJ65SBTC4-16DT.
It is not only able to connect the PC system UNIX, windows system, etc.,
And can connect a variety of FA devices.
The Ethernet module has the function of Internet e-mail receiving and sending,
The user can send and receive the production information conveniently in any place of the world,
Build a remote monitoring management system.
At the same time, the use of the Internet FTP server functions and MELSEC protocol can be very easy to achieve the program upload / download and transfer of information. Cable length: 0.33 meters.
Extending cable to connect CPU main substrate and extended substrate,
According to the model can provide different cable length,
If you need to connect the AnN type expansion substrate is required,
Selection of A1SC05NB (A1SC07NB) cable.
Input type: DC input, positive common end.
Input points: 8 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type.
Output points: 8 points.
OFF leakage current: 0.25mA.
Output protection function.
Rated load voltage / current: DC24V/0.5A.
External connection: 4 wire.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual statee of the scene,
Create the necessary environmental conditions for the operation of the program AJ65SBTC4-16DT.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.